1. Introduce the customer to the installation steps
Request assistance to move equipment obstructing the probe installation.
2. Fix the base and the glycol bottle under a shelf so that everything is as close as possible to the middle of the device. The bottle cap should point toward the bottom of the device.
If the shelf is a grid, secure the support with a ty-rap on each side of the bottle (use 2 ty-raps in total).
If the tablet is not a grid, stick the Velcro directly under the tablet and attach the support.
3. Place the probe extension through the access port. For refrigerators with a drawer, use a plug to facilitate the passage of the extension.
If the device does not have an input port, pass the female connection through the door seal on the hinge side.
4. Connect the power supply and attach the Do not unplug label to it.
If power strip, attach the power supply to it with electrical tape.
5. Position the transmitter on the front side of the device.
6. Secure the probe and power supply wiring following the lines on the device.
Ensure clearance in the power supply wiring to allow the device to move freely.
7. Attach a cable tie to the 2 end of the power supply.
8. Position the ATEK sticker at the top right of the device.
Stop installations at least 1 hour before the customer's closing time
9. Before leaving the site
Functional verification with the customer
Creation of the customer user account
Checking temperatures with the client on their phone or computer
Configuring temporary notification conditions while waiting for training
Temporarily calibrate -80C freezers “without certificate” with the freezer display if it is not possible to calibrate immediately